Batten System

 

This shows the redwood 1" x 2" batten which supports the track. The track sections are nailed to the batten.

The batten is supported every few feet by a redwood stake driven to the proper depth. The battens are screwed to the stakes with galvanized dry wall screws.

Return to Article